The project includes the design (preparation of a technical design) and construction of a bypass section of the Ruse - Veliko Tarnovo motorway with a length of 35.4 km. The beginning is immediately after the "full cloverleaf" type junction with the I-5 "Ruse - Byala" road, and the end - after the junction with the I-3 "Pleven - Byala" road.
The gauge of the motorway is G27, with a width of 27.50 m in the area of the facilities. The route includes:
• 4 viaducts, including one over the Yantra River;
• 5 large facilities at road intersections – 4 underpasses and 1 overpass;
• 4 agricultural intersections;
• 2 types of recreational areas – type 1 (for short-term recreation) and type 2 (with the possibility of commercial facilities).
To provide the best user experience, we use technologies such as cookies to store and/or access information about your device. Consenting to these technologies allows us to process data such as browsing behavior or unique identifiers on this site. Refusing or withdrawing consent may adversely affect certain features and capabilities.